Pages

Batching


  • In proportioning  design mix concrete the quantity of both cement and aggregates shall be determined by weight. Water shall be measured by   volume in calibrated tanks or weighted. All measuring  equipment  shall be maintained in clean  serviceable condition and their  accuracy shall he periodical checked. 
  • The material shall be stock piled for several hours,  preferably a day  before use. 
  • Where the aggregates supplied are not graded, different sizes  shall be blended in right proportions. The different  size  shall be stacked  in separate stock piles.

No comments:

Post a Comment